Hunter Road Bridge

 

Project Description

The replacement of an existing bridge over the Little Beaver Creek.

Click here for Transportation Programs

                                                                         

Project Location Map 

Hunter











Project Status

Phase I preliminary engineering is completed.
Phase II design engineering is underway.
Construction is anticipated to start in 2025

Public Involvement Opportunities

Click here to leave feedback on this project

Available Documents

Hunter Road Bridge Detour
Bridge Inspection Report 2024
Existing Agricultural Drain Tile Investigation
Existing Bridge Plans
Hydraulic Report
Location Drainage Study
LPC 663
Preliminary Environmental Site Assessment
Preliminary Site Investigation
Special Waste Assessment
Structural Geotechnical Report 

Contact Information 

Scott Czaplicki, P.E.
MCDOT Project Manager
sdczaplicki@transystems.com

Scope of Work Municipality County Board District
Bridge Replacement Unincorporated  Chemung Township District 8
Category Lead Agency Total Cost
Preservation McHenry County DOT $2,650,000